Marcus Garvey Park, New York, NY. New Amphitheater.
We provided structural steel detailing, connections design and moment connection calculations. Weight of the structural steel - 150,000#.
December 6, 2010 an union crew erected structural steel with total weight - 56,000#:
one 75 feet long girder built from W24x306 and two (2) W12x336 profiles, weight of the girder - 28,000#
one W24x279 48 feet long girder,
two 56 feet long side bent beams built from two (2) W12x30 and one (1) HSS8x4x3/8 profiles,
two W12x252, three W24x62 beams and three W12x58 cantilever beams.